Design and construction of vacuum control system on EAST

L. Wang, Y. Zhang, Q.S. Hu, X.M. Wang, X.M. Gu2008年Fusion Engineering and DesignIF 1.7出版社

装置

east高精度(タイトル一致)

wiki

EAST
この論文にはまだAI要約がありません。

関連論文

Vacuum and wall conditioning system on EAST

2009Fusion Engineering and Design

ITER vacuum vessel design and construction

2010Fusion Engineering and Design

ITER Vacuum Vessel design and construction

2012Fusion Engineering and Design

East integrated control system

2010Fusion Engineering and Design

Design finalization and start of construction of ITER vacuum vessel

2011Fusion Engineering and Design

Preliminary design of the remote handling system for the ITER vacuum vessel pressure suppression system

2025Fusion Engineering and Design

EAST plasma control system

2008Fusion Engineering and Design

Design and implementation of antenna control system for EAST ECRH

2024Fusion Engineering and Design

Design progress of the vacuum vessel sectors and ports towards the ITER construction

2008Fusion Engineering and Design

EAST in-vessel components design

2005Fusion Engineering and Design