Qualification tests and facilities for the ITER superconductors

P. Bruzzone, R. Wesche, B. Stepanov, F. Cau, M. Bagnasco, M. Calvi, R. Herzog, M. Vogel2009年被引用 10Nuclear FusionIF 3出版社

All the ITER superconductors are tested as short length samples in the SULTAN test facility at CRPP. Twenty-four TF conductor samples with small layout variations were tested since February 2007 with the aim of verifying the design and qualification of the manufacturers. The sample assembly and the measurement techniques at CRPP are discussed. Starting in 2010, another test facility for ITER conductors, named EDIPO, will be operating at CRPP to share with SULTAN the load of the samples for the acceptance tests during the construction of ITER.

日本語訳

すべてのITER超伝導体は、CRPPのSULTAN試験施設において短尺サンプルとして試験される。2007年2月以降、小型のレイアウト変更を施した24本のTF導体サンプルが、設計の検証とメーカーの資格認定を目的として試験されてきた。サンプル組立およびCRPPにおける測定技術について論じる。2010年以降は、EDIPOと名付けられたITER導体用のもう一つの試験施設がCRPPで稼働し、ITER建設期間中の受入試験においてSULTANの負担を分担することになる。

装置

iter高精度(タイトル一致)

wiki

ITER
この論文にはまだAI要約がありません。

関連論文

The first performance of the facility for testing ITER CC conductor short sample

2011Fusion Engineering and Design

The first DC performance test and analysis of CC conductor short sample at ASIPP conductor test facility

2012Fusion Engineering and Design

Qualification tests for ITER TF conductors in SULTAN

2009Fusion Engineering and Design

Performance evaluation of the CFETR central solenoid model coil under operating conditions

2026Nuclear Fusion

Recent results from R&D on superconductors at CRPP

2003Nuclear Fusion

Performance test and analysis of the first large-scale cable-in-conduit conductor with high Jc Nb3Sn strand for fusion reactor

2021Nuclear Fusion

Performance test of sample coils in the Korea superconducting tokamak advanced research magnetic diagnostics test chamber

2001Review of Scientific Instruments

Material testing facilities and programs for plasma-facing component testing

2017Nuclear Fusion