An overview is presented of the progress since 2021 in the construction and scientific programme preparation of the Divertor Tokamak Test (DTT) facility. Licensing for building construction has been granted at the end of 2021. Licensing for Cat. A radiologic source has been also granted in 2022. The construction of the toroidal field magnet system is progressing. The prototype of the 170 GHz gyrotron has been produced and it is now under test on the FALCON facility. The design of the vacuum vessel, the poloidal field coils and the civil infrastructures has been completed. The shape of the first DTT divertor has been agreed with EUROfusion to test different plasma and exhaust scenarios: single null, double null, X-divertor and negative triangularity plasmas. A detailed research plan is being elaborated with the involvement of the EUROfusion laboratories.
2021年以降のDivertor Tokamak Test(DTT)施設の建設および科学的プログラム準備における進捗状況の概要を示す。建物建設の許可は2021年末に付与された。Cat. A放射線源の許可も2022年に付与された。トロイダル磁場磁石システムの建設は進んでいる。170 GHzジャイロトロンのプロトタイプが製造され、現在FALCON施設で試験中である。真空容器、ポロイダル磁場コイル、および土木インフラの設計は完了した。最初のDTTダイバータの形状は、異なるプラズマおよび排気シナリオ(シングルヌル、ダブルヌル、Xダイバータ、負三角形度プラズマ)を試験するためにEUROfusionと合意された。詳細な研究計画は、EUROfusion研究所の関与のもとで策定されている。