Corrigendum to “Status of SPIDER beam source after the first 3.5 years of operation” [Fusion Engineering and Design, Volume 192, July 2023, 113831]

M. Pavei, C. Gasparrini, G. Berton, M. Agostini, G. Serianni2023年Fusion Engineering and DesignIF 1.7出版社

wiki

SPIDER
この論文にはまだAI要約がありません。

関連論文

Status of SPIDER beam source after the first 3.5 years of operation

2023Fusion Engineering and Design

Corrigendum to “Initial accident scenario analysis in support of a preliminary DEMO tritium plant design” [Fusion Engineering and Design 189 (2023) 113482]

2026Fusion Engineering and Design

Corrigendum to “The design and development of the Super-X device data acquisition and monitoring system” [Fusion Engineering and Design, Volume 196, 2023, 114019]

2023Fusion Engineering and Design

Corrigendum to “Total Ionizing Dose Estimation of ITER Upper Port Remote Handling Equipment” [Fusion Engineering and Design volume 202 (2024) 114359]

2024Fusion Engineering and Design

Corrigendum to “Approach to Startup Inventory for Viable Commercial Fusion Power Plant” <[Fusion Engineering and Design 206 (2024), 114563>]

2024Fusion Engineering and Design

Spider beam source ready for operation

2019Fusion Engineering and Design

Corrigendum to “Neutronics analysis for conceptual design of target system based on a deuteron accelerator-driven fusion neutron source” [Fusion Engineering and Design, 199, 2023, 114103]

2024Fusion Engineering and Design

Corrigendum to ‘Fracture-mechanical behaviour of ITER grade tungsten subjected to three different rolling processes’. Fusion Engineering and Design 184 (2022) 113300

2023Fusion Engineering and Design

Detail design of the beam source for the SPIDER experiment

2010Fusion Engineering and Design

Corrigendum to “Thermal stability of differently rolled pure tungsten plates in the temperature range from 1125°C to 1250°C” [Fusion Engineering and Design 192 (2023) 113581:1-6]

2025Fusion Engineering and Design