Status and programme of JET

P H Rebut, B J Green1984年Plasma Physics and Controlled FusionIF 2.2出版社

After a five year construction phase, the Joint European Torus produced its first plasma onJune 25, 1983. This represented the culmination of considerable effort on the part of allconcerned and was according to the plan established at the commencement of the JET JointUndertaking in June 1978. In particular, the installation of the machine itself began inJanuary 1982 when the torus hall was handed over (building construction began in May 1979),and the first machine octant was installed in August 1982. The final machine octant was placed in position in December 1982. Since then, commissioning of many of the subsystems has taken place, leading to the first plasma, and subsequently to a limited amount of "exploratory" machine operation.

日本語訳

5年間の建設期間を経て、欧州共同トーラス(JET)は1983年6月25日に初めてプラズマを生成した。これは、関係者全員による多大な努力の集大成であり、1978年6月にJET共同事業が開始された際に策定された計画に従ったものである。特に、装置自体の設置は、トーラスホールが引き渡された1982年1月に開始され(建屋建設は1979年5月に開始)、最初のマシンオクタントは1982年8月に設置された。最後のマシンオクタントは1982年12月に据え付けられた。それ以降、多くのサブシステムの試運転が行われ、初プラズマの達成、そしてその後の限定的な「探索的」装置運転へとつながった。

装置

jet高精度(タイトル一致)

wiki

JET
この論文にはまだAI要約がありません。