This paper presents a summary of recent progress pertaining to the manufacturing and inspection of ITER gyrotrons and the operation system in QST. Major achievements are as follows. (i) The final design of the ITER gyrotron was accomplished and manufacturing of two ITER gyrotrons was completed. Then operation test in QST prior the shipment to ITER has started with ITER relevant high voltage power supply configuration. The 1st ITER gyrotron has achieved 1.05 MW operation for 300 s with 51% efficiency. Measured cooling channel waveform of 300 s pulse demonstrated thermally stable condition representing sufficient cooling performance for 1 MW CW operation; (ii) 5 kHz modulation operation was demonstrated up to 200 s at with >0.8 MW at flat top of pulses; (iii) 300 s/1 MW operation was repeated for 20 shots with successful 19 shots which demonstrating >95% of reliability requirement. These results lead to success of ITER EC H&CD system construction and commissioning toward first plasma.
本論文は、QSTにおけるITERジャイロトロンの製造・検査および運転システムに関する最近の進展の概要を示すものである。主な成果は以下の通りである。(i) ITERジャイロトロンの最終設計が完了し、2基のITERジャイロトロンの製造が完了した。その後、ITERへの出荷前にQSTにおいてITER関連の高電圧電源構成を用いた運転試験が開始された。1号機のITERジャイロトロンは、51%の効率で300秒間の1.05 MW運転を達成した。300秒パルスの冷却チャネル波形の測定により、1 MW CW運転に十分な冷却性能を表す熱的に安定した状態が実証された。(ii) 5 kHz変調運転が、パルスのフラットトップで>0.8 MWにて最大200秒間実証された。(iii) 300秒/1 MW運転が20ショット繰り返され、19ショットが成功し、>95%の信頼性要件を実証した。これらの結果は、初プラズマに向けたITER EC H&CDシステムの建設および試運転の成功につながるものである。