FusionPapers
図版検索トレンドwiki日本の研究
© 2026 FUSIONPAPERS
About法務情報
トップに戻る

Validation of 500-kW/1000-s operation of 5-GHz klystron for KSTAR LHCD system

Jeehyun Kim, Taesik Seong, Seungil Park, Y.S. Bae, Moohyun Cho2019年Fusion Engineering and DesignIF 1.7出版社

装置

kstar高精度(タイトル一致)

wiki

KSTARLower hybrid current drive
この論文にはまだAI要約がありません。

関連論文

Test result of 5 GHz, 500 kW CW prototype klystron for KSTAR LHCD system

2011Fusion Engineering and Design

Development status of KSTAR 5 GHz LHCD system

2010Fusion Engineering and Design

Steady state high power test system at 3.7 GHz

2001Fusion Engineering and Design

Test and operation of high-power RF system for KSTAR helicon current drive system

2021Fusion Engineering and Design

Design and validation of a 700 kW/CW water load for 3.7 GHz klystrons

2011Fusion Engineering and Design

Design of mid-plane passive active multijunction antenna for 5-GHz KSTAR LHCD system

2017Fusion Engineering and Design

High field side LHCD launcher study for KSTAR

2019Fusion Engineering and Design

Development and operation of fast protection for KSTAR

2016Fusion Engineering and Design