FusionPapers
図版検索トレンドwiki日本の研究
© 2026 FUSIONPAPERS
About法務情報
トップに戻る

Commissioning and first operational experience with the new thyristor converter Group 7 of ASDEX Upgrade

Nils Arden, Friedhelm Albers, Dan Carlton, Claus-Peter Käsemann, Walter Zunnebeld2023年Fusion Engineering and DesignIF 1.7出版社

装置

asdex-upgrade高精度(タイトル一致)

wiki

ASDEXASDEX Upgrade
この論文にはまだAI要約がありません。

関連論文

Extension of the high current power supplies of ASDEX Upgrade—The design of a new thyristor converter

2019Fusion Engineering and Design

145 MVA modular thyristor converter system with neutral control for ASDEX upgrade

2003Fusion Engineering and Design

Thyristor crowbar system for the high current power supplies of ASDEX upgrade

2005Fusion Engineering and Design

10 MVA thyristor converters for the active damping of generator shaft oscillations at ASDEX Upgrade

2009Fusion Engineering and Design

Development and optimization of a new control interface for the ASDEX upgrade high current converters

2025Fusion Engineering and Design

New drive converter and digital control for the pulsed power supply system of ASDEX Upgrade

2015Fusion Engineering and Design

Final implementation of the new upper divertor with coils in ASDEX Upgrade

2025Fusion Engineering and Design

A new upper divertor with internal coils for ASDEX upgrade – Status of the project

2019Fusion Engineering and Design

Commissioning and initial operation experience with ASDEX Upgrade's new real-time control and data acquisition

2006Fusion Engineering and Design

The ASDEX Upgrade ICRF system: Operational experience and developments

2005Fusion Engineering and Design