The results of the studies of critical issues affecting the feasibility, objectives and cost of the INTOR design for a tokamak engineering test reactor that have been carried out in the INTOR Workshop over the period 1981-83 are summarized. An improved INTOR design concept is described. The objectives, schedule and test programme of INTOR are discussed, and specific R and D programmes are suggested to resolve design uncertainties.