FusionPapers
図版検索トレンドwiki日本の研究
© 2026 FUSIONPAPERS
About法務情報
トップに戻る

Considerations in testing of ITER first wall mockups

T.J. Tanaka, R.E. Nygren, D.L. Youchison, M.A. Ulrickson2007年Fusion Engineering and DesignIF 1.7出版社

装置

iter高精度(タイトル一致)

wiki

ITERFirst wall
この論文にはまだAI要約がありません。

関連論文

Fabrication and high heat flux test of large mockups for ITER first wall semi-prototype

2011Fusion Engineering and Design

Heat flux tests of the ITER first Wall qualification mockups at KoHLT-1

2011Fusion Engineering and Design

Fabrication and high heat flux test with the first wall mockups for developing the KO TBM

2011Fusion Engineering and Design

Progress on fatigue characterization of ITER primary first wall mock-ups

2003Fusion Engineering and Design

Design for in-pile thermal fatigue of first wall mock-ups under ITER relevant conditions

2007Fusion Engineering and Design

Main achievements of the EU HT test programme of ITER primary wall small scale mock ups

2000Fusion Engineering and Design

Thermo-hydraulic testing and integrity of ITER Test Blanket Module (TBM) First Wall mock-up in JAEA

2010Fusion Engineering and Design

High heat flux test with HIP-bonded Cu/SS mock-ups for the ITER first wall

2008Fusion Engineering and Design

High heat flux test with HIP bonded Be/Cu/SS mock-ups for the ITER first wall

2009Fusion Engineering and Design

Numerical analysis of the manufacturing processes of a mock-up of the ITER NHF First Wall Panel

2018Fusion Engineering and Design