FusionPapers
図版検索トレンドwiki日本の研究
© 2026 FUSIONPAPERS
About法務情報
トップに戻る

Main achievements of the EU HT test programme of ITER primary wall small scale mock ups

P Lorenzetto, A Cardella, P Chappuis, W Daenner, S Tähtinen2000年Fusion Engineering and DesignIF 1.7出版社

AbstractThis paper presents the main achievements of the European Home Team (EU HT) test programme of ITER primary wall small scale mock ups. It describes briefly the fabrication method of the mock ups, the test conditions and the main results obtained with high heat flux and thermal fatigue tests of Cu alloy/stainless steel and beryllium/Cu alloy/stainless steel mock ups. The results obtained so far show very good thermal fatigue performance and operation margin of the ITER primary first wall concept.

日本語訳

本論文は、ITER第一壁小型モックアップの欧州ホームチーム(EU HT)試験プログラムにおける主な成果を提示するものである。本論文では、モックアップの作製方法、試験条件、ならびに銅合金/ステンレス鋼およびベリリウム/銅合金/ステンレス鋼モックアップの高熱流束および熱疲労試験によって得られた主な結果について述べる。これまでに得られた結果は、ITER第一壁概念の極めて良好な熱疲労性能と運転余裕を示している。

装置

iter高精度(タイトル一致)

wiki

ITER
この論文にはまだAI要約がありません。

関連論文

Thermal–mechanical test on ITER primary first wall mock-ups

2002Fusion Engineering and Design

Manufacturing and testing of monoblock tungsten small-scale mock-ups

2001Fusion Engineering and Design

High heat flux components with beryllium armour: From the small-scale mock-ups to the full-scale prototype of the ITER first wall panel

2024Fusion Engineering and Design

Thermal fatigue testing of an ITER primary wall small scale mock up

1998Fusion Engineering and Design

Evaluation of mock-ups before manufacture of a shield block prototype by powder HIP

2000Fusion Engineering and Design

High heat flux tests on heat sinks armored with tungsten rods

2000Fusion Engineering and Design

ITER primary first wall mock-up fabrication and testing for Be/Cu alloy joining development

2002Fusion Engineering and Design

High heat flux test with HIP bonded Be/Cu/SS mock-ups for the ITER first wall

2009Fusion Engineering and Design

Design for in-pile thermal fatigue of first wall mock-ups under ITER relevant conditions

2007Fusion Engineering and Design

High heat flux test with HIP-bonded Cu/SS mock-ups for the ITER first wall

2008Fusion Engineering and Design