FusionPapers
図版検索トレンドwiki日本の研究
© 2026 FUSIONPAPERS
About法務情報
トップに戻る

High heat flux components with beryllium armour: From the small-scale mock-ups to the full-scale prototype of the ITER first wall panel

P.Yu. Piskarev, А.А. Gervash, D.A. Glazunov, E.V. Okuneva, V.V. Levichev2024年Fusion Engineering and DesignIF 1.7出版社

装置

iter高精度(タイトル一致)

wiki

ITERFirst wallBeryllium
この論文にはまだAI要約がありません。

関連論文

Manufacturing of small-scale mock-ups and of a semi-prototype of the ITER Normal Heat Flux First Wall

2014Fusion Engineering and Design

Overview of the EU small scale mock-up tests for ITER high heat flux components

1998Fusion Engineering and Design

Fabrication and high heat flux test of large mockups for ITER first wall semi-prototype

2011Fusion Engineering and Design

ITER baffle module small-scale mock-ups: First Wall thermo-mechanical testing results

1998Fusion Engineering and Design

Main achievements of the EU HT test programme of ITER primary wall small scale mock ups

2000Fusion Engineering and Design

Manufacture of two primary first wall panel prototypes with Beryllium armor for ITER

2003Fusion Engineering and Design

Thermal–mechanical test on ITER primary first wall mock-ups

2002Fusion Engineering and Design

Fast brazing development for the joining of the beryllium armour layer for the ITER first wall panels

2007Fusion Engineering and Design

High heat flux tests of mock-ups for ITER divertor application

1998Fusion Engineering and Design

Manufacture and first wall joining for an ITER primary wall module prototype: results of a medium scale mock-up manufacturing

2001Fusion Engineering and Design