AbstractIn 1998, in the frame of the ITER EDA phase, an European R&D Programme for the Blanket Design was implemented for developing and selecting the materials and the relevant fabrication procedures for manufacturing the shielding modules of the ITER Primary Wall. The fabrication of several Beryllium armored small scale mock-ups, reproducing representative portions of a Primary Wall panels, was also launched (Fusion Technol. (1998) 195). Further experimental activities were also programmed for investigating the thermal–mechanical behavior of these mock-ups at high heat flux and under thermal fatigue tests. In 2001, the ITER European Home Team decided to assign to ENEA a contract for the thermal fatigue testing of six mock-ups aiming at verifying the reliability of the Beryllium/Dispersion Strengthened Copper alloy/Stainless Steel and Beryllium/Precipitation hardened Copper alloy/Stainless Steel joints manufactured by solid Hot Isostatic Pressing (HIP) procedure (Technical Specification for the Thermal Fatigue Tests of Be protected EDA Mock-ups). The paper presents the results of the FEM thermal–mechanical analyses performed by ANSYS code and the progress of the first test campaign.
1998年、ITER EDAフェーズの枠組みの中で、ITER第一壁の遮蔽モジュールを製造するための材料の開発と選定、ならびに関連する製造手順を目的とした欧州R&Dプログラムが実施された。また、第一壁パネルの代表的な部分を再現する、ベリリウム被覆を施した数体の小型モックアップの製作も開始された(Fusion Technol. (1998) 195)。さらに、高熱流束下および熱疲労試験下におけるこれらのモックアップの熱機械的挙動を調査するための実験活動も計画された。2001年、ITER欧州共同研究チームは、ベリリウム/分散強化銅合金/ステンレス鋼およびベリリウム/析出硬化型銅合金/ステンレス鋼の接合部の信頼性を検証することを目的として、熱間静水圧プレス(HIP)法により製造された6体のモックアップの熱疲労試験をENEAに委託することを決定した(EDAモックアップのBe保護材熱疲労試験仕様書)。本論文では、ANSYSコードによる有限要素法(FEM)熱機械解析の結果と、最初の試験キャンペーンの進捗状況について報告する。