TCV is presently undergoing major heating upgrades, installing a neutral beam for direct ion heating and increasing the electron cyclotron (EC) power injected in X-mode at the third harmonic (X3). The neutral beam is under construction at BINP-Plasma LLC (Russia), with energies of 18–35 keV and power up to 1 MW for 2 s. The injection of 1 MW 30 keV D-beam will allow access to regimes with Ti/Te > 1 and βN ∼ 2.8 in L- and H-mode, with densities compatible with X3 EC heating. A lower energy and power (20 keV, 0.5 MW) D NBI is suitable for lower densities with X2 EC heating and current drive. The vacuum vessel has been modified to allow for the beam tangential injection, necessary for beam access and to minimize shine through and orbit losses. The X3 upgrade consists of adding two dual-frequency gyrotrons (X2/X3, 126 GHz/84 GHz) with a total power of 2 MW. In addition, to explore solutions to the exhaust problem in tokamaks and test innovative solutions like the snowflake divertor in the presence of a closed divertor chamber, we are considering inserting new in-vessel modular structures, generating a divertor aperture with variable closure.
TCVは現在、主要な加熱アップグレードを実施しており、直接イオン加熱のための中性粒子ビームを設置し、第3高調波(X3)でXモード入射される電子サイクロトロン(EC)パワーを増強している。中性粒子ビームはBINP-Plasma LLC(ロシア)で建設中であり、エネルギー18–35 keV、パワーは2秒間最大1 MWである。1 MW、30 keVのDビームの入射により、X3 EC加熱と適合する密度において、LモードおよびHモードでTi/Te > 1およびβN ∼ 2.8の領域へのアクセスが可能になる。より低いエネルギーおよびパワー(20 keV、0.5 MW)のD NBIは、X2 EC加熱および電流駆動を伴うより低い密度に適している。真空容器は、ビームの接線入射を可能にするために改造された。これはビームのアクセスに必要であり、シャインスルーと軌道損失を最小化するためである。X3アップグレードは、合計パワー2 MWの二周波数ジャイロトロン(X2/X3、126 GHz/84 GHz)2基を追加することからなる。さらに、トカマクにおける排気問題の解決策を探求し、閉じたダイバータ室の存在下でスノーフレークダイバータのような革新的な解決策を試験するために、可変閉鎖度を持つダイバータ開口部を生成する新しい真空容器内モジュール構造を挿入することを検討している。