FusionPapers
図版検索トレンドwiki日本の研究
© 2026 FUSIONPAPERS
About法務情報
トップに戻る

ITER Central Solenoid Precompression Test Mock-up – Validation phase to prepare the assembly on-site

Cyril Brun, Clément Nguyen, Patrick Decool, Antoine Jonas, Kevin Freudenberg2023年Fusion Engineering and DesignIF 1.7出版社

装置

iter高精度(タイトル一致)

wiki

ITERMock-upCentral solenoid
この論文にはまだAI要約がありません。

関連論文

From manufacture to assembly of the ITER central solenoid

2019Fusion Engineering and Design

The ITER Central Solenoid Module final test facility

2017Fusion Engineering and Design

Metallurgical assessment of large size tensioning components for the precompression structure of the ITER central solenoid

2021Fusion Engineering and Design