The JT-60 neutral beam injector consists of 14 beam line units and injects a rated power of 20 MW with an energy level of 70–100 keV for beam pulses up to 10 s. The total handling power of ion and/or neutral beams in the beam line unit amounts to as much as 8 MW per unit for a beam extraction of 100 keV/80 A, though each unit delivers a neutral beam power of about 1.4 MW. Accordingly, the beam stop components have to receive a high heat load. Another difficulty is that the beam stops must receive quasi continuous heat loadings for up to 10 s. The design procedures and the measured characteristics of the beam stop components irradiated with the beam are described. In the maximum rated operation of a 100 keV/80 A beam extraction for a beam pulse up to 10 s, the incident power to the beam stop components in the beam line unit has roughly reached the design value, and every component works well now.
JT-60中性粒子入射装置は、7基のビームライン装置から構成され、エネルギー70~100keV、ビームパルス最大10秒間で、定格出力20MWを入射する。ビームライン装置におけるイオンおよび/または中性粒子ビームの総処理パワーは、100keV/80Aのビーム引き出しに対して1基あたり最大8MWに達するが、各装置が供給する中性粒子ビームパワーは約1.4MWである。したがって、ビームストップ構成要素は高い熱負荷を受けなければならない。もう一つの困難は、ビームストップが最大10秒間の準連続的な熱負荷を受けなければならないことである。ビーム照射を受けるビームストップ構成要素の設計手順と測定特性について述べる。100keV/80Aのビーム引き出し、ビームパルス最大10秒間の最大定格運転において、ビームライン装置内のビームストップ構成要素への入射パワーはほぼ設計値に達しており、現在すべての構成要素は良好に動作している。