The fully superconducting tokamak JT-60SA achieved its first plasma already during the first operational campaign (OP-1) in 2023. To obtain this result, a suitable operation procedure of magnet system, temperature and coil current control was essential. During the same operational campaign, OP-1, JT–60SA was able to generate a diverted plasma with 1.2 MA of plasma current. However, the PF coil current was limited to 5 kA during this operational campaign with respect to a maximum current up to 10 kA tested during the single coil excitation test performed before the plasma experiments. In the next operational campaign OP-2, nominal current (20 kA) operation will be demonstrated for the PF coil system, so they can fulfill their purpose of producing high-performance plasmas. Aiming at this, various improvements were considered for safe energization and protection of the coils.
全超伝導トカマクJT-60SAは、2023年の最初の運転キャンペーン(OP-1)中に初プラズマを達成した。この結果を得るためには、磁石システムの適切な運転手順、温度およびコイル電流制御が不可欠であった。同じ運転キャンペーン(OP-1)の間に、JT-60SAはプラズマ電流1.2 MAのダイバータプラズマを生成することができた。しかし、この運転キャンペーン中、PFコイル電流は、プラズマ実験の前に実施された単一コイル励磁試験で試験された最大電流10 kAに対して、5 kAに制限されていた。次の運転キャンペーンOP-2では、PFコイルシステムについて定格電流(20 kA)運転が実証される予定であり、それにより高性能プラズマの生成という目的を果たすことができる。この目的に向けて、コイルの安全な励磁と保護のための様々な改良が検討された。