FusionPapers
図版検索トレンドwiki日本の研究
© 2026 FUSIONPAPERS
About法務情報
トップに戻る

Preliminary thermomechanical assessment of the prototypical mock-up of the DEMO WCLL first wall to be tested in the Water Loop facility

F.M. Castrovinci, P. Arena, N. Badodi, G. Bongiovì, E. Vallone2025年9月Fusion Engineering and DesignIF 1.7出版社

wiki

DEMOFirst wallMock-upWater-cooled lead-lithium
この論文にはまだAI要約がありません。

関連論文

Thermal-hydraulic analysis of WCLL BB First-Wall mock-up in Water Loop facility under transient conditions

2025Fusion Engineering and Design

Thermal-hydraulic pre-test analysis of the WCLL BB TBM mock-up in view of the experimental campaign to be performed in Water Loop facility

2026Fusion Engineering and Design