In this paper an extensive database of SPARC H-modes confinement predictions has been provided, to assess its variability with respect to few input assumptions. The simulations have been performed within the ASTRA framework, using the quasi-linear model TGLF SAT2, including electromagnetic effects, for the core transport, and a neural network trained on EPED simulations to predict the pedestal height and width self-consistently. The database has been developed starting from two SPARC H-mode discharges (12.2 T, i.e. Primary Reference Discharge or PRD, and 8 T, i.e. reduced field) and permuting four input parameters (W concentration, DT mixture concentration, temperature ratio at top of pedestal and deviation of pedestal pressure from the EPED prediction), to perform a sensitivity study. For the PRD a scan of auxiliary input power (ion cyclotron heating) has been performed up to 25 MW, to keep highly radiative plasmas above the LH power threshold as predicted by Martin and Schmidtmayr power scalings. A scan of pedestal density has then been performed for both PRD and 8 T databases. and at top of pedestal showed the biggest impact on the fusion gain. Significant variation is observed across the database, highlighting the importance of sensitivity studies. Below a certain W concentration, the 12 T database shows that Q > 5 is consistently achieved for full-field H-modes with 11 MW of auxiliary power, and values of Q > 2 are assured when increasing the input power to keep the plasma in H-mode. The 8 T database demonstrates that SPARC can access a Q > 1 operational window with low W concentration, making it a potentially interesting scenario for obtaining breakeven conditions.
This paper presents a comprehensive study on the performance predictions of the SPARC fusion reactor under various H-mode scenarios. The researchers used advanced modeling tools to explore the sensitivity of the fusion gain (Q) to key input parameters, such as impurity concentration, fuel mixture, and pedestal conditions. The results show that SPARC can consistently achieve Q > 5 with 11 MW of auxiliary power and Q > 2 with higher power, highlighting its potential to reach breakeven conditions.