FusionPapers
図版検索トレンドwiki日本の研究
© 2026 FUSIONPAPERS
About法務情報
トップに戻る

Beamline duct monitoring of the TJ-II neutral beam injectors

Macarena Liniers, Gilles Wolfers, Jose Antonio Sebastián, Beatriz Rojo, Alfonso Soleto y Javier Alonso2013年Fusion Engineering and DesignIF 1.7出版社

装置

tj-ii高精度(タイトル一致)

wiki

Neutral beamTJ-IINeutral beam injector
この論文にはまだAI要約がありません。

関連論文

Beam transmission dependence on beam parameters for TJ-II Neutral Beam Injectors

2017Fusion Engineering and Design

Beam duct for the 1 MW neutral beam injector on TCV

2020Fusion Engineering and Design

Beam duct for the 1 MW neutral beam heating injector on TCV

2017Fusion Engineering and Design

Power transmission of the neutral beam heating beams at TJ-II

2007Fusion Engineering and Design

Beam stops of JT-60 neutral beam injector

1989Fusion Engineering and Design

Neutral beam injection optimization at TJ-II

2005Fusion Engineering and Design

RAMI evaluation of the beam source for the DEMO neutral beam injectors

2020Fusion Engineering and Design

Analytical Beamlet Code 3D for neutral beam injectors: principles and applications

2020Plasma Physics and Controlled Fusion

Conceptual design of a beam source for negative neutral beam injector of CRAFT facility

2021Fusion Engineering and Design

Beam divergence and power loading on the beamline components of the negative-ion based NBI system for JT-60U

2001Fusion Engineering and Design