The integrated core-pedestal-SOL model is applied to the simulation of a typical DEMO operation. Impurity seeding is used to reduce the power load on the divertor to acceptable levels. The influence on long-pulse operation of impurity seeding with various impurities is investigated. DEMO operation at acceptable peak power loads and long-pulse lengths is demonstrated.