FusionPapers
図版検索トレンドwiki日本の研究
© 2026 FUSIONPAPERS
About法務情報
トップに戻る

Establishing the Wendelstein 7-X steady state plasma control and data acquisition system during the first operation phase

Anett Spring, Torsten Bluhm, Michael Grahl, Martin Grün, Andreas Werner2017年Fusion Engineering and DesignIF 1.7出版社

装置

wendelstein-7x高精度(タイトル一致)

wiki

Steady stateWendelsteinData acquisitionPlasma controlData acquisition system
この論文にはまだAI要約がありません。

関連論文

Technical challenges in the construction of the steady-state stellarator Wendelstein 7-X

2013Nuclear Fusion

Preparing the operation of Wendelstein 7-X in the steady-state regime

2023Fusion Engineering and Design

Experiences with the Segment Control system at Wendelstein 7-X operation

2017Fusion Engineering and Design

Control system of WENDELSTEIN 7-X experiment

2003Fusion Engineering and Design

Key results from the first plasma operation phase and outlook for future performance in Wendelstein 7-X

2017Physics of Plasmas

Refrigerator operation during commissioning and first plasma operations of Wendelstein 7-X

2017Fusion Engineering and Design

Tasks and structure of the WENDELSTEIN 7-X control system

2006Fusion Engineering and Design

Performance of Wendelstein 7-X stellarator plasmas during the first divertor operation phase

2019Physics of Plasmas

User interaction concept for plasma discharge control on WENDELSTEIN 7-X

2006Fusion Engineering and Design

Status report on the development of the data acquisition system of Wendelstein7-X

2004Fusion Engineering and Design