The need of a neutron source for the qualification of materials to be used in future fusion power reactors has been recognized in the European Union (EU) fusion programme for many years. The construction and exploitation of this facility is presently considered to be critical to the construction of the DEMOnstration Power Plant (DEMO). This issue has prompted the EU to launch activities for the design and engineering of the International Fusion Materials Irradiation Facility-DEMO Oriented Neutron Source (IFMIF-DONES) facility based on and taking profit of the results obtained in the Engineering Validation and Engineering Design Activities (IFMIF/EVEDA) project, presently conducted in the framework of the EU–Japan Bilateral Agreement on the Broader Approach to Fusion.These activities and research and development work for the IFMIF-DONES plant are presently taking place in the framework of a work package of the EUROfusion Consortium, in direct collaboration with the Fusion for Energy organization. The main objective of these activities is to consolidate the design and underlying technology basis in order to be ready for the start of the IFMIF-DONES construction as early as possible.In this paper, an overview and the present status of the IFMIF-DONES engineering design is presented for a generic site, making emphasis on the recent design evolution from previous phases.
核融合炉用材料の認定のための中性子源の必要性は、長年にわたり欧州連合(EU)の核融合計画において認識されてきた。この施設の建設と運転は、現在、DEMO(実証発電炉)の建設にとって極めて重要であると考えられている。この問題に対処するため、EUは、国際核融合材料照射施設-DEMO指向中性子源(IFMIF-DONES)の設計と工学に関する活動を開始した。これは、現在EUと日本の二国間協定である「Broader Approach」の枠組みで実施されているIFMIF/EVEDA(工学検証・工学設計活動)プロジェクトの成果を活用するものである。IFMIF-DONESの設計と関連する研究開発作業は、現在、EUROfusionコンソーシアムのワークパッケージの枠組みの中で、Fusion for Energy機関と直接協力して実施されている。これらの活動の主な目的は、IFMIF-DONESの建設を可能な限り早期に開始できるよう、設計とその基盤となる技術基盤を確立することである。本論文では、IFMIF-DONESの工学設計の概要と現状を、一般的なサイトを想定して提示し、これまでの段階からの最近の設計進化に重点を置いている。