As the primary candidate of ITER Test Blanket Module (TBM) to be tested under the leadership of Japan, a water cooled solid breeder (WCSB) TBM is being developed. This paper shows the recent achievements towards the milestones of ITER TBMs prior to the installation, which consist of design integration in ITER, module qualification and safety assessment. With respect to the design integration, targeting the detailed design final report in 2012, structure designs of the WCSB TBM and the interfacing components (common frame and backside shielding) that are placed in a test port of ITER and the layout of the cooling system are presented. As for the module qualification, a real-scale first wall mock-up fabricated by using the hot isostatic pressing method by structural material of reduced activation martensitic ferritic steel, F82H, and flow and irradiation test of the mock-up are presented. As for safety milestones, the contents of the preliminary safety report in 2008 consisting of source term identification, failure mode and effect analysis (FMEA) and identification of postulated initiating events (PIEs) and safety analyses are presented.
ITERのテストブランケットモジュール(TBM)の主要候補として、我が国が主導して開発を進めている水冷却固体増殖材(WCSB)TBMについて、これまでに得られた成果を報告する。本論文では、ITERへの設置前のマイルストーンに向けた最近の成果として、ITERにおける設計統合、モジュール認定、安全評価について述べる。設計統合については、2012年の詳細設計最終報告書を目標に、ITERのテストポートに設置されるWCSB TBMとそのインターフェース機器(共通架台および背面遮蔽体)の構造設計と、冷却システムのレイアウトを示す。モジュール認定については、低放射化マルテンサイト鋼F82Hを構造材料とし、熱間静水圧圧延(HIP)法を用いて作製した実寸大の第一壁モックアップと、そのモックアップの流動試験および照射試験について示す。安全マイルストーンについては、線源項の同定、故障モード影響解析(FMEA)、想定起因事象(PIE)の同定からなる2008年予備安全報告書の内容と安全解析について示す。