The capabilities of steady state operation at the stellarator W7-X with emphasis on divertor design

H. Renner, J. Boscary, V. Erckmann, H. Greuner, H. Grote, J. Sapper, E. Speth, F. Wesner, M. Wanner, W7-X Team2000年被引用 88Nuclear FusionIF 3出版社

The stellarator Wendelstein 7-X (W7-X) is presently under construction at Greifswald, Germany, and the start of operation is planned in 2006. W7-X is a large `advanced stellarator' of the HELIAS type (R = 5.5 m, a = 0.55 m, B0 = 3 T, five periods, moderate shear and variable rotational transform 5/6 ⩽ ι ⩽ 5/4 at the boundary) with the aims of demonstratingthe reactor potential of this stellarator line in steady state operation close to fusion relevant parameters. The capability of stationary operation requires the realization of a superconducting magnet system consisting of 50 modular coils and 20 planar coils, the operation of a 140 GHz ECR CW heat source of 10 MW, the installation of a divertor to handle the power and particle flux, and to limit the impurity fraction to tolerable levels. Additional heating schemes, ICRF and NBI, will be provided for flexible experimentation.

日本語訳

恒星状器Wendelstein 7-X(W7-X)目前正在德国格赖夫斯瓦尔德建造,计划于2006年开始运行。W7-X是一个大型“先进恒星状器”,属于HELIAS类型(R = 5.5 m,a = 0.55 m,B0 = 3 T,五个周期,中等剪切,边界处旋转变换5/6 ⩽ ι ⩽ 5/4),其目标是在接近聚变相关参数的稳态运行条件下,展示该恒星状器系列的反应堆潜力。稳态运行的能力要求实现由50个模块化线圈和20个平面线圈组成的超导磁体系统,运行10 MW的140 GHz ECR连续波热源,安装偏滤器以处理功率和粒子通量,并将杂质份额限制在可容忍的水平。还将提供额外的加热方案,即ICRF和NBI,以支持灵活的实验。

装置

wendelstein-7x高精度(タイトル一致)

wiki

DivertorStellaratorSteady stateW7-X
この論文にはまだAI要約がありません。

関連論文

Final integration, commissioning and start of the Wendelstein 7-X stellarator operation

2017Nuclear Fusion

Divertor concept for the W7-X stellarator and mode of operation

2002Plasma Physics and Controlled Fusion

First results from divertor operation in Wendelstein 7-X

2019Plasma Physics and Controlled Fusion

Design and construction of WENDELSTEIN 7-X

2001Fusion Engineering and Design

First divertor physics studies in Wendelstein 7-X

2019Nuclear Fusion

Technical challenges in the construction of the steady-state stellarator Wendelstein 7-X

2013Nuclear Fusion

Performance of Wendelstein 7-X stellarator plasmas during the first divertor operation phase

2019Physics of Plasmas

Overview of the results from divertor experiments with attached and detached plasmas at Wendelstein 7-X and their implications for steady-state operation

2021Nuclear Fusion

The magnet system of Wendelstein 7-X stellarator in operation

2018Fusion Engineering and Design

Design goals and status of the WENDELSTEIN 7-X project

2000Plasma Physics and Controlled Fusion