Understanding the performance of limiter plasmas in the ITER start-up phase is important for the whole pulse and a possible challenge if performed on tungsten, as will now be the case following the switch to a W first wall in the new 2024 ITER Baseline. Experiments were performed on ASDEX Upgrade and WEST to characterise limiter plasmas using boronizations with different degree of boron surface coverage and toroidal asymmetries. Non-boronized start-up is shown to be slow and laborious, and, on both machines, was aborted in favor of a non-homogeneous boronization, performed also in support of the ITER re-baseline to study the impact of spatially non-uniform boron coatings. This allows normal start-up and short (few 100 m s, ITER will run s long limiter phases) limiter phases can be run without problems. Even with a full boronization, the limiter can de-condition and long limiter plasmas of several seconds suffer from high densities and radiation. Short limiter plasmas for plasma current ramp-up remain possible. The conditioning effect on limiter plasmas is documented, but also how the start-up is affected by an ageing boronization.
ITERの立ち上げ段階におけるリミタープラズマの性能を理解することは、パルス全体にとって重要であり、2024年の新しいITERベースラインにおけるW第一壁への切り替えに伴い、タングステン上で実施される場合には潜在的な課題となる。ASDEX UpgradeとWESTにおいて、異なるホウ素表面被覆率とトロイダル非対称性を持つボロナイゼーションを用いたリミタープラズマの特性評価実験が実施された。非ボロナイズ状態での立ち上げは遅く困難であることが示され、両装置において、不均一なボロナイゼーションを優先して中止された。これは、空間的に不均一なホウ素被覆の影響を研究するためのITERの再ベースライン支援としても実施されたものである。これにより、通常の立ち上げと短時間(数百m s、ITERでは秒オーダーのリミター相が予定されている)のリミター相が問題なく実行可能となる。完全なボロナイゼーションを行った場合でも、リミターは脱コンディショニングを起こす可能性があり、数秒に及ぶ長時間のリミタープラズマは高密度と高放射に悩まされる。プラズマ電流立ち上げのための短時間リミタープラズマは引き続き可能である。リミタープラズマに対するコンディショニング効果が記録されているが、経年劣化したボロナイゼーションが立ち上げにどのように影響するかも示されている。