In 1998, after six years of joint work originally foreseen under the ITER engineering design activities (EDA) agreement, a design for ITER had been developed fulfilling all objectives and the cost target adopted by the ITER parties in 1992 at the start of the EDA. While accepting this design, the ITER parties recognized the possibility that they might be unable, for financial reasons, to proceed to the construction of the then foreseen device. The focus of effort in the ITER EDA since 1998 has been the development of a new design to meet revised technical objectives and a cost reduction target of about 50% of the previously accepted cost estimate. The rationale for the choice of parameters of the design has been based largely on system analysis drawing on the design solutions already developed and using the latest physics results and outputs from technology R&D projects. In so doing the joint central team and home teams converge towards a new design which will allow the exploration of a range of burning plasma conditions. The new ITER design, whilst having reduced technical objectives from its predecessor, will nonetheless meet the programmatic objective of providing an integrated demonstration of the scientific and technological feasibility of fusion energy. Background, design features, performance, safety features, and R&D and future perspectives of the ITER design are discussed.
1998年、ITER工学設計活動(EDA)協定の下で当初想定された6年間の共同作業を経て、ITERの設計は、1992年のEDA開始時にITER参加極が採用したすべての目標とコスト目標を満たすものとして策定された。この設計を受け入れるにあたり、ITER参加極は、財政上の理由から、当時見込まれていた装置の建設に進めない可能性があることを認識した。1998年以降のITER EDAにおける取り組みの焦点は、改訂された技術目標と、従来の承認済みコスト見積もりの約50%というコスト削減目標を満たす新設計の開発に置かれてきた。設計パラメータの選択根拠は、既に確立された設計解を基盤としつつ、最新の物理研究成果と技術R&Dプロジェクトの成果を活用したシステム解析に主として依拠している。これにより、統合中央チームと各極の国内チームは、多様な燃焼プラズマ条件の探求を可能とする新設計へと収束している。新設計のITERは、先行設計と比較して技術目標は縮減されているものの、核融合エネルギーの科学的・技術的実現可能性を統合的に実証するという計画目標は引き続き満たしている。本稿では、ITER設計の背景、設計特徴、性能、安全特性、ならびにR&Dおよび今後の見通しについて論じる。